Emergency Mobilisations
ICON’s rapid response capabilities came to the fore when Woodside was faced with the prospect of having to pull the semi-submersible Sedco 703’s lower marine riser package to repair an inoperable riser dump valve.
-
Fast tracked air transport of a skid to PNG
Within two days ICON had completed design, fabrication and delivery of this equipment, which installed and operated flawlessly first time. This equipment resulted in a saving of approximately AUD$2M.
ICON and its fabricators worked around the clock to meet Woodside’s tight schedule and also worked closely with Subsea 7 and Woodside’s logistics contacts to ensure that the system would be suitable for commercial freight, helicopter transit and ROV installation.