Projects
[Sort by categories]
     Selected Projects
     Design -
     Conceptual Studies &
     FEED
     Design -
     Detailed and / or
     Multidisciplinary Design
     Construction
     (General) - Offshore
     Construction
     (General) - Onshore
     Installation of
     Offshore Structures
     Drilling Support
     Equipment
 

Selected Projects

Contact Us

Tel:  +61 8 6313 5500
Fax: +61 8 6313 5599

Level 1, 50 Kings Park Road
West Perth 6005
Western Australia

Displaying Projects 36 - 40 of 51

            

BHP Petroleum - Buffalo Field Development
Timor Sea

Installation of Wellhead Platform

ICON Engineering was engaged to install the Buffalo Field wellhead platform in 30m of water in the Timor Sea north of Darwin Australia.

ICON assisted with the preparation of the installation contracts for the FPSO and infield pipelines and interfaced directly with BHPP's drilling department on issues relating to the use of the jackup rig Ron Tappmeyer for the installation work.

Download brochure  

   

ICON Engineering Project

 
     
         
 

            

Talisman Malaysia
East Bunga Raya – BR-D Platform
Substructure and MOAB Installation

ICON Engineering was engaged by Talisman Malaysia to undertake the installation engineering for the MOAB structure at the Bunga Raya field. ICON Engineering developed the installation procedures including detailed stability analysis for the tow and sinking of the substructure.

ICON Engineering performed geotechnical installation analysis, selected the suction pumps for installation of the suction piles and designed the ballasting umbilical system.

Download brochure
 

           
    ICON Engineering Project      
           
               
 
   

            

Wandoo and Woollybutt Fields
Operating and Abandonment
Liability Assessment

ICON Engineering was engaged by a consortium of bidders to undertake the following work scopes:

•  Identify regulatory requirements
•  Define procedures for removal of all facilities.
•  Prepare cost estimates to P10, P50 and P90 levels for facility and well
   abandonment
•  Determine the ongoing operating costs

Download brochure
  

           
ICON Engineering Project
 
 

            

Shell UK Limited
Skiff Field Development
Platform Installation by Jackup Rig


ICON Engineering was commissioned by Shell to provide assistance with the installation of the Skiff platform in the Southern North Sea. The platform was installed by a jackup drilling rig. This was the first platform to be installed by this means in the UK sector of the North Sea. The installed cost was a fraction of that required using conventional methods

The project won the British Government Construction Industry Civil Engineering Award for 2000 in recognition of the novel design and installation method which challenged traditional practices.

Download brochure
 

           
    ICON Engineering Project      
 

            

Newfield Petroleum
Jabiru Field Abandonment Study


ICON Engineering was employed by Newfield to perform a study of the abandonment of the Jabiru Field. ICON produced a report outlining the costs and issues associated with the various options to assist the client in
discussions with regulatory authorities.

Download brochure  

           
ICON Engineering Project
 
  Previous     1  |  2  |  3  |  4  |  5  |  6  |  7  |  8  |  9  |  10  |  11  Next  
© ICON Engineering Pty Ltd
Top of page    Print this page   Disclaimer   Sitemap
  Home | About Us | Services | Products | Projects | Contact Us | Careers | Client Login