   Murphy Sarawak Oil Co Ltd. West Patricia Field Development WP-IA.  

ICON Engineering carried out the installation of the WP-IA Jacket and the floatover installation of the WP-IA topsides.
 



 


 
   Murphy Sarawak Oil Co Ltd. West Patricia Field Development WP-PA.

ICON Engineering carried out the installation of the WP-PA Jacket and the floatover installation of the WP-PA topsides.
 
 

 


 
   Arc Energy NL. Hovea Production Facility, Dongara WA.

ICON Engineering carried out multi discipline engineering design for an onshore oil production and 3 phase separation plant. The role expanded to include project management, procurement and commissioning.
 
 
 
 


 
  Apache Energy Limited. Victoria Field Development.

ICON Engineering carried out the installation of the Victoria platform jacket and topsides.

 
 
 

 
 

 
    Apache Energy Limited. Double Island Field Development.

ICON Engineering was responsible for the design, fabrication and installation of the Double Island minimal platform.
 
     
 

 

 
    Diamond Offshore. Ocean Bounty Semisubmersible Drilling Rig Upgrade.

ICON Engineering undertook a turnkey contract to lower the cellar deck, install a new pedestal crane, relocate an existing pedestal crane and provide a subsea tree skidding system. The work was undertaken offshore and while on tow between drilling locations rather than in a shipyard.
 
 

 

 
  Lundin Malaysia Ltd. Bunga Kekwa Annex Platform Installation.

ICON Engineering carried out the installation of the Bunga Kekwa-A Annex platform.
 
 

 

 
   Chevron Australia - Addition of Cowle 5 well slot to monopod.

ICON Engineering designed, fabricated and installed a new well slot on the Cowle monopod.
 
 

 

 
  Shell UK Limited - Skiff Platform Installation.

ICON Engineering provided client representation for Shell during the installation of the Skiff Platform in the Southern North sea. The platform was completely installed by a jackup rig - a first for Shell.
 
 
   
       

 

 
  Apache Energy Limited. Client Representation for Wonnich Platform Installation.

ICON Engineering was engaged to review the installation procedures and supervise the offshore installation of the Wonnich platform. This platform was installed in 30m water depth with the jackup rig Ensco 56.
 
 
 

 

 
    BHP Petroleum Ltd. Installation of Buffalo platform.

ICON Engineering was responsible for the installation engineering and the offshore installation of the Buffalo Wellhead Platform installed in the Timor Sea.
 
 

 

 
  Esso Australian Limited. Installation of subsea flowline jumpers for the Blackback field.

ICON Engineering was responsible for the installation of the flowline jumpers linking the wells and the export pipeline. The water depth was 400m. The work was carried out from the Sedco 702 MODU.
 
 

 

 
  Schlumberger Oilfield Australia. Sedco 703 MODU Vessel impact repair.

ICON Engineering was commissioned to project manage and execute repair of vessel impact damage to a stability column on Sedco 703 rig
 
 
 
   

 

 
   West Australian Petroleum Pty. Limited. Design and Installation of an additional conductor slot on Saladin A Platform.

ICON Engineering reanalysed the existing platform, confirmed that it could support an additional conductor, then designed fabricated and installed the additional bracing, guides and hatches.
 
 
 

 

 
   Schlumberger Oilfield Australia. Sedco 703 MODU christmas tree skid beams.

ICON Engineering was commissioned to design, fabricate and install the tree skidding system on the semi-submersible drilling rig Sedco 703. System allows assembly and skidding of 60 tonne trees into the moonpool area for installation.
 
   
     

 

 
   Schlumberger Oilfield Australia. Sedco 702 lifeboat platform repair.

ICON Engineering designed and installed a replacement lifeboat platform for the Sedco 702 MODU. All work was carried out whilst the rig was under tow to New Zealand.
 
 
       

 

 
   Schlumberger Oilfield Australia. Sedco 702 ROV deck for the Blackback project.

ICON Engineering designed and installed a large cantilevered deck to allow a work class ROV to be deployed outside the rigs pontoons. This ROV was used for tie in of the Blackback flow lines.
 
 
   

 

 
  BHP Petroleum Ltd. Preparation of contract documentation and assistance with project management for the Buffalo project.

ICON Engineering has been involved in the drafting of the contract for the installation of the FPSO, pipeline and wellhead platform. Personnel have been located in BHPP’s Melbourne office and in ICON's Perth office for this work.
 

   
For further details about
ICON
Engineering's
previous projects please
contact one of the Directors.
     
  IPC Malaysia Ltd. Installation of Bunga Kekwa topsides.

This work involved provision of complete installation services including personnel to seafasten, transport and install the BKA topsides. Installation was carried out with the Sedco "Trident 17" jackup drilling rig.
 
   
     
   TOP

© 2008 ICON Engineering Pty Ltd
| Home | Company | Directors | Client List |
|
Services & Products | Conceptual Studies | Design | Installation & Construction | Operations | Equipment |
|
Previous Projects | Contact Us | Brochure | Employment
| Client Login | Legal | Site Map |