   Murphy Sarawak Oil Co Ltd. West Patricia Field Development WP-IA.  

ICON Engineering carried out the installation of the WP-IA Jacket and the floatover installation of the WP-IA topsides.
 



   


 
   Murphy Sarawak Oil Co Ltd. West Patricia Field Development WP-PA.

ICON Engineering carried out the installation of the WP-PA Jacket and the floatover installation of the WP-PA topsides.
 
 

 
 


 
   Arc Energy NL. Hovea Production Facility, Dongara WA.

ICON Engineering carried out multi discipline engineering design for an onshore oil production and 3 phase separation plant. The role expanded to include project management, procurement and commissioning.
 
 
 
 


 
    Apache Energy Limited. Double Island Field Development.

ICON Engineering was responsible for the design, fabrication and installation of the Double Island minimal platform.
 
     
     


 

   BHP Billiton Petroleum (Americas). Angostura Feed Project, Trinidad.

ICON Engineering performed a multidiscipline Front End Engineering Design (FEED) Project for three unmanned offshore wellhead platform topsides and detailed auditable cost estimates.

 
 
     
       


 
    Diamond Offshore. Ocean Bounty Semisubmersible Drilling Rig Upgrade.

ICON Engineering undertook a turnkey contract to lower the cellar deck, install a new pedestal crane, relocate an existing pedestal crane and provide a subsea tree skidding system. The work was undertaken offshore and while on tow between drilling locations rather than in a shipyard.
 
 


 
  Lundin Malaysia Ltd. Bunga Kekwa Annex Platform Installation.

ICON Engineering carried out the installation of the Bunga Kekwa-A Annex platform.
 
 

 
  Design of Active Heave Compensator - Safe Link.

ICON Engineering has designed an in-line hydraulically controlled 'safe-link' to prevent overtensioning of the marine riser in case of lock up of active heave compensation systems on semisubmersible drilling rigs. This follows several incidents caused by failure of active compensation systems.
 


 
    BHP Petroleum Ltd. Installation of Buffalo platform.

ICON Engineering was responsible for the installation engineering and the offshore installation of the Buffalo Wellhead Platform installed in the Timor Sea.
 
 


 
  Esso Australian Limited. Installation of subsea flowline jumpers for the Blackback field.

ICON Engineering was responsible for the installation of the flowline jumpers linking the wells and the export pipeline. The water depth was 400m. The work was carried out from the Sedco 702 MODU.
 
 
 


 
  Statoil Norway. Conceptual design of In Line Heave Compensator.

Following a serious incident in late 1998, Statoil are considering the use of a backup in line heave compensator to prevent overtensioning of the marine riser in case of lock up of the primary compensator.
 
 
     

  West Australian Petroleum Pty. Limited. Evaluation of likely development costs for exploration prospects in the Barrow Island and Thevenard Island area.
 
   

 
  West Australian Petroleum Pty. Limited. Study of costs to process third party production on Barrow Island and Thevenard Island.
 

 
  IGL / BHP Petroleum. Study of option to install a process module on the Challis riser for BHP Petroleum.

This work would allow the Challis field to produce to the Jabiru Venture without the need for an FPSO at Challis. This work was carried out in conjunction with IGL Engineering who carried out the process design.
 

 
  IGL / Cultus Petroleum. Feasibility study for the Tenacious field.

This work involves tie in of a remote subsea development to the Jabiru Venture FPSO. It also includes work on the Jabiru Venture itself. The work was carried out in conjunction with IGL Engineering and Subsea Services.
 
   
     

  IPC Malaysia Ltd. Installation of Bunga Kekwa topsides.

This work involved provision of complete installation services including personnel to seafasten, transport and install the BKA topsides. Installation was carried out with the Sedco "Trident 17" jackup drilling rig.
 

 
  SOCDET Management Ltd. Study of development options and report on existing facilities in the Philippines NW Palawan Basin.

ICON Engineering generated capex and opex costs for a large number of development scenarios including subsea, stand alone platforms and FPSO facilities. ICON Engineering worked in conjunction with SOCDET’s drilling group and its exploration consultants. The evaluation of the existing facilities required a site visit to assess the existing facilities and to review records in the Philippines offices.
 

  West Australian Petroleum Pty. Limited. Study of development options for the Swell and Euryale deep water prospects for WAPET.

This work included an evaluation of the development options and costs as well as a survey and assessment of the lease FPSO market in the year 2002.
 

 
  West Australian Petroleum Pty. Limited. Study of the pipeline route and installation options for the Pasco field.

The development of Pasco requires a pipeline in very shallow rocky terrain with high currents and waves. The economics are marginal and demand a low cost solution.
 

   

 
    Woodside Petroleum / BRK. North West Shelf Development 2nd Trunkline Project, conceptual trenching machine.

This project is being carried out in conjunction with Kirk Engineering Consultants and includes the study of rock cutting and ploughing machines. A testing programme is currently being developed for prototype machines developed in the first phase of the work.
 
 
For further details about
ICON
Engineering's
previous projects please
contact one of the Directors.
     
     
   TOP

© 2008 ICON Engineering Pty Ltd
| Home | Company | Directors | Client List |
|
Services & Products | Conceptual Studies | Design | Installation & Construction | Operations | Equipment |
|
Previous Projects | Contact Us | Brochure | Employment
| Client Login | Legal | Site Map |