Roc Oil Ltd
Dongara, Western Australia
Cliff Head Project Platform Installation
ICON Engineering was commissioned to install,
hookup and commission the wellhead platform and topsides by Roc Oil
for the Cliff Head project in Australia. The jacket and topsides were
fabricated in Malaysia and transported to site on a dedicated barge.
The jacket was loaded out and transported vertically.
ICON was responsible for seafastening
design, naval architecture and preparation of the tow plan.
Apache Energy Ltd
Linda Field Development
Linda Platform Installation
Apache engaged ICON Engineering to undertake the installation
of the Linda Platform offshore Western Australia. The 355 tonne jacket
was lifted horizontally using the jackup rig Ensco 56. The jacket was
upended and lowered to the seabed using ICON’s proprietary lifting
sub arrangement.
The Linda Platform Installation is yet another
successful project utilising a jackup rig to install the structure.
ICON Engineering provided the conceptual design & installation engineering,
followed by the structural & geotechnical detailed design for the
BR-A Annexe Monopods for Talisman Malaysia. The Annexe is braced back
to the existing BR-A CPP.
By using the braced suction pile monopod concept, the design and installation
was simplified and the cost was significantly lower than installing
an adjacent stand alone structure.
Talisman Malaysia Limited
Bunga Kekwa C Annexe Platform
Conceptual Design and Installation
ICON Engineering undertook a conceptual review and recommended an annexe
monopod platform braced back to the existing BKC wellhead platform as
the most cost effective solution for Talisman to add new wells on the
BKC platform. The design concept was able to be installed by drilling
rig or derrick barge.
Santos (Sampang)
Ltd
Oyong Field Development
Tall Template Structure
ICON Engineering was contracted
by Santos to provide conceptual engineering, multi-discipline detailed
design and installation engineering for the Oyong wellhead platform
in Indonesia.
ICON developed a Tall Template Structure (TTS) and Short Template Structure
(STS) for the jacket and topsides respectively.