|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
 |
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
Tel:
+61 8 6313 5500
Fax: +61 8 6313 5599
Level 1, 50 Kings Park Road
West Perth 6005
Western Australia |
|
|
|
|
|
|
Displaying
Projects 11 - 15 of 30
|
|
|
|
|
|
|
|
|

ICON Engineering was contracted
by Santos to provide conceptual engineering, multi-discipline detailed
design and installation engineering for the Oyong wellhead platform
in Indonesia.
ICON developed a Tall Template Structure (TTS) and Short Template Structure
(STS) for the jacket and topsides respectively.
| |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|

ICON Engineering carried out conceptual engineering, multi-discipline
detailed design and installation engineering for the Maleo wellhead
platform for Santos in Indonesia. The platform is braced to a converted
MODU production facility. As with the previous Oyong project ICON developed
a TTS and STS for the jacket and topsides respectively.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

ICON Engineering was commissioned by ARC Energy to perform engineering
design and preparation of engineering documents such as process flow
diagrams, P & I Ds, and multidiscipline design as well as project
management, operating procedures, documentation for regulatory authorities,
assistance with construction supervision and commissioning.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|

| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|

ICON Engineering was commissioned by ARC Energy to perform detailed
multidiscipline engineering design and construction management for the
facility. ICON prepared all design deliverables including process flow
diagrams and P&IDs.
The work included equipment procurement, construction
and commissioning management, pipeline design & installation and
operations support.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|

Lundin had a need to support 2 additional wells from the 6 well slot
Bunga Kekwa A platform. From conceptual design of the annexe platform
to platform installation the total project duration achieved by ICON
was only 4 1/2 months. The project was completed during the peak of
the north east monsoon season without any incidents, injuries or medical
treatments.
ICON's scope covered design assistance, installation procedure development
and all installation works.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
Previous
1 | 2 | 3 | 4 | 5 | 6 Next
| |
|
|
|
|
|
|
|
| |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|