Projects
Sort by category
     Selected Projects
     Design -
     Conceptual Studies &
     FEED
     Design -
     Detailed and / or
     Multidisciplinary Design
     Construction
     (General) - Offshore
     Construction
     (General) - Onshore
     Installation of
     Offshore Structures
     Drilling Support
     Equipment
 

Design
Conceptional Studies & FEED

Contact Us

Tel:  +61 8 6313 5500
Fax: +61 8 6313 5599

Level 1, 50 Kings Park Road
West Perth 6005
Western Australia

Displaying Projects 26 - 29 of 29
            

Trencher Plough Feasibility Study
Woodside Offshore Petroleum
WA NW Shelf Second Trunkline Project

The study addressed trencher and plough options for stabilising the proposed 42” second trunkline. Trenching machine options were considered due to the existence of cap rock, which cannot be ploughed over a large proportion of the route. The concept utilised two powerful cutter slicers, which precede the plough and allow the material to be removed by the plough section.

This project was carried out in conjunction with several other specialist sub- consultants.


Download brochure  
ICON Engineering Project
     
         

            

West Australian Petroleum (WAPET)
Reanalysis of Saladin A Platform and
Installation of Fourth Conductor, 1999


ICON Engineering was engaged to reanalyse the Saladin A platform to support an additional well conductor. The work involved analysis and detailed design work for the conductor guide and hatches. The optimum solution chosen utilised a single conductor guide just above water and avoided any installation work below the water surface. ICON provided a turnkey service covering conceptual and detailed design, fabrication, preparation of installation procedures and supervision of offshore installation.

Download brochure
 

 
ICON Engineering Project
 
 

            

Roller Skate Joint Development Project
Western Australian Petroleum Pty Ltd [now Chevron]
North West Self, Western Australia


ICON founders, Garrick Aberle and David Field were respectively the Project Manager and Designer / Senior Installation Engineer for this project. The development consists of 4 monopod platforms, two subsea pipelines and shore based oil separation nad gas sales conditioning facilities.

The 26 km long, 3 phase, 26” diameter production line and 36 km long, 6” gas export line were constructed using the beach pulled / bottom tow method. At the time, this was one of the longest pipelines in the world constructed in this manner.


Download brochure

           
    ICON Engineering Project      
 

            

Yammaderry And Cowle Joint Development Project
West Australian Petroleum Pty Limited 1991
Offshore Thevenard Island, NW Australia


The installation, hookup and commissioning work was undertaken by WAPET
in-house using a team led by current ICON Engineering Directors. The
substructure was lifted from the transportation supply vessel horizontally
and upended using the rig's draw works. The structures were installed into
foundation holes drilled using reverse circulation techniques. They were then
grouted into place.

Download brochure  

           
    ICON Engineering Project      
 
  Previous     1  |  2  |  3  |  4  |  5  |  6  
© ICON Engineering Pty Ltd
Top of page    Print this page   Disclaimer   Sitemap
  Home | About Us | Services | Products | Projects | Contact Us | Careers | Client Login