ICON Engineering provided engineering and management support to ARC
for all these infield and export pipelines. Scope of work included project
management, conceptual analysis, route determination, documentation
for regulatory authorities, design validator liaison, pipe procurement,
construction management and commissioning.
| |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|

t
ICON Engineering was commissioned by BHPB to perform a FEED study
and cost estimates for three wellhead platform topsides, offshore Trinidad.
ICON’s work in Perth commenced with a conceptual
proposal to meet client requirements that the wellhead platforms be
unmanned, remotely controlled, with restricted personnel visits. Work
then proceeded to multi-discipline detailed design.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

ICON Engineering provided operational support services to Nexen
Petroleum on the Buffalo Field in the Timor Sea. ICON had originally
installed the Buffalo platform.
The work scope included detaileled involvement
in budget preparation and to undertake emergency projects such as the
recovery of the tanker loading hose and key projects such as drilling
programs and abandonment planning for the field.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
| |
|
|
|
|
|
|
|

ICON Engineering was commissioned by Cairn Energy to undertake
a conceptual study of a minimal facilities development of the South
Sangu gas field offshore Chittagong in Bangladesh.
The work scope included a conceptual study of
the South Sangu platform, the pipeline to Sangu A and the design of
a deck extension and host facilities to be installed on the Sangu A
platform.
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|

ICON Engineering was engaged by a consortium of bidders to undertake
the following work scopes:
• Identify regulatory requirements
• Define procedures for removal of all facilities.
• Prepare cost estimates to P10, P50 and P90 levels for
facility and well
abandonment
• Determine the ongoing operating costs
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|